datacenters

45 bookmarks
2026-06-23 · worksinprogress.co

Why American data centers can't plug in

The AI buildout is bottlenecked by energy. But America has the electricity to power its data centers; the problem is getting it to them.

That process is significantly backlogged. Though the median power plant in 2005 waited less than 20 months for interconnection, this had jumped to 55 months by 2023.
The interconnection process wasn’t created for today’s world. Grids use an inflexible first-come, first-served queue that leaves some of the most valuable projects stuck behind less important ones.
2025-02-13 · semianalysis.com

Datacenter Anatomy Part 2 – Cooling Systems

Cluster deployments are an order of magnitude larger in scale with Gigawatt-scale datacenters coming online at full capacity much faster than most believe. As such, there are considerable desi…

2025-02-13 · semianalysis.com

Datacenter Anatomy Part 1: Electrical Systems

Meta Datacenter Scrapped, Vertiv, Schneider Electric, Eaton, Legrand, Delta, Datacenter Bill Of Materials By Component, Transformers, Switchgear, Redundancy, UPS, OCP Busbar, Generators, Substation…

2024-06-12 · 42u.com

Hot Aisle Containment - 42U

Exhausting hot air away from your servers with Hot Aisle Containment solutions eliminates bypass airflow issues and reduces data center energy consumption and lowers your related power costs.

2024-06-12 · open.substack.com

How to Build an AI Data Center

This piece is the first in a new series from the Institute for Progress (IFP), called Compute in America: Building the Next Generation of AI Infrastructure at Home. In this series, we examine the challenges of accelerating the American AI data center buildout. Future pieces will…